B2B SERVICE · BALTICS

IT equipment and server relocation

Server rooms, network gear, workstations. We relocate with full inventory, a labeling system and minimal downtime — often over a weekend.

IT relocation is not box moving — it is risk management. The two things that matter most are downtime and data security. One unplanned server room move can halt an entire company, so ELP Baltics works in phases or over a weekend, with full equipment inventory, a cable labeling system (photo-documented before disconnect) and a team NDA. We move server racks, switches, UPS, workstations and peripherals — from small offices to server rooms with 10+ racks.

10+ years' experienceHundreds of completed B2B relocation projects across the Baltics.
Full insuranceEvery project is insured — liability for equipment and cargo.
Written guaranteeFixed quote and acceptance reports for every stage.
Reply within 24 hWe answer your enquiry within 24 h and quote within 72 h.
WHAT'S INCLUDED

IT equipment we relocate

Standard project — one server room or a 20–100 workstation office. All work is documented and coordinated with your IT team.

Server racks

Rack disassembly, transport on anti-vibration platforms and rebuild at the new site following the original layout.

Network gear

Switches, routers, firewalls, patch panels. Cables are labeled and photographed before disconnect.

Power & cooling

UPS, battery banks, PDUs. Transported with discharged batteries or per manufacturer requirements.

Workstations

PCs, monitors, docks, IP phones. Packed per user in numbered boxes for fast rebuild at the new site.

Inventory

Full equipment list with serial numbers, QR tagging and an acceptance report. Useful for asset accounting and audit.

Heavy equipment (Zonzini)

Fully loaded racks up the stairs without a lift — Zonzini Domino Lift robot up to 800 kg.

Storage

Between sites — ELP facility 5–60 days, controlled temperature and humidity, restricted access.

Confidentiality

Team NDA, sealed containers for sensitive gear, separate logistics for data media on request.

HOW WE WORK

Five stages for IT equipment relocation

  1. 01

    Inquiry and equipment list

    Send your equipment list (racks, workstations) or invite us for a survey. We reply within 24 hours.

  2. 02

    Survey and downtime plan

    A coordinator aligns the disconnect window (usually weekend or night) and rebuild order with your IT team.

  3. 03

    Quote

    Within 48 hours — fixed offer with schedule, insurance and a downtime guarantee.

  4. 04

    Disconnect and move

    Photo-documentation, cable labeling, safe disassembly, transport on anti-vibration platforms and rebuild.

  5. 05

    Commissioning and report

    Rebuild to the original layout, power-on check together with your IT, acceptance report signed.

PRICING

Indicative IT relocation prices

Final price depends on the number of racks, workstation count and the downtime window (weekend / night).

Project typeTeamDurationIndicative price (excl. VAT)
Small server room (1–3 racks)4 people + truck1 day (weekend)from €1 400
Office 20–50 workstations5–6 people + 2 vehicles1–2 daysfrom €2 600
Office 50–100 ws + server room6–10 people + 2–3 vehicles2–3 daysfrom €4 800
Data center / 10+ racksPer projectPer schedulecustom quote

* Prices cover inventory, packing, transport up to 30 km and rebuild. Server-level disconnect/reconnect can be done by your IT team or our partner. Heavy equipment via Zonzini robot is a separate line.

How IT relocation differs

IT relocation is driven not by weight but by two invisible factors: downtime and data traceability. A company can move an office in a day, but a server room must come back online at an exact planned time — so we work in windows (weekend, night) and plan the rebuild in reverse from the power-on moment.

The second factor is documentation. Every cable is labeled and photographed before disconnect, every device gets a QR tag with its serial number. This lets us rebuild everything exactly as it was and gives you a full asset inventory after the move.

Data security

Sensitive data media (backups, encrypted drives) can be moved via separate logistics in a sealed container with its own acceptance report. The team works under NDA.

Coordination with IT

Server-level disconnect and power-on are usually handled by your IT team or our partner. Our responsibility is the physical disassembly, safe transport and rebuild to the layout.

FAQ

Frequently asked questions

READY?

Order your IT equipment relocation

Send your equipment list — get a quote within 24–48 hours including a downtime plan.

ELP BALTICS, MB · Įmonės kodas 306986407 · PVM LT100017188117 · Saltoniškių g. 31-306, LT-08106 Vilnius
ELP GLOBAL, MB · Įmonės kodas 306195108 · PVM LT100016544216 · Saltoniškių g. 31-306, Vilnius